Bio: 

manage  the operations, maintenance and repairs of the university's  co-generation facility. first started work it was as a boiler operator on the graveyard shift which was located at the old heat plant across from goss stadium  move up from operator to coordinator. then i was offered the supervisor position. In 2003 i started pushing upper management for a new plant and in 2009 the energy center came on line. fully operational in 2010. electrical production was limited to 5.5 MW's, 2017 i presented an idea to Mike Green with the installation of a condensing steam turbine that project in under way now. At present we generate 50-60% of OSU usage. that will increase making it a no brainer. the crew i work with is the best at what they do. .